dotted border
Northwest Corner logo2 The Project  Plans & Pictures  The Timetable  Questions & Answers  Creating a Legacy
What is it?
Why now?
The benefits
The team
What's new?
 Site plans
The model
Construction photos
Videos/Slideshows
Campus Map
 An overview
Current schedule
Notices
 FAQs
Construction mitigation
For the media
 A place in history
Providing support
WCC Video
     
 
CURRENT PHOTOS
 

Arches and Steel Erection 2009

             
  Northwest Arch Installation   Steel Erection   Southwest Arch Installation   View from Pound Hall   Arial View  
                     
 
ARCHIVE PHOTOS
 

The House Moves 2007

  Carriage House preparation, view 1   Carriage House preparation, view 2   Baker House preparation, view 1   Baker House lifted off its foundation Ukrainian House Preparation  
            
  Partial demolition of North Hall  Ukrainian House Moving down Mass Ave., View 1  Ukrainian Housing Moving down Mass Ave., View 2  Baker House Moving down Mass Ave.  Carriage House Moving down Mass Ave.  

 

Wyeth Hall Demolition 2007

  Wyeth Hall Demolition, View 1  Wyeth Hall Demoliton, View 2  Wyeth Hall Demolition, View 3  Wyeth Hall Demolition, View 4  Wyeth Hall Demolition, View 5  

 

Everett St. Garage Demolition 2007

  Everett St. Garage Demolition Preparation, View 1  Everett St. Garage Demolition Preparation, View 2  Everett St. Garage Demolition  Everett St. Garage Demolition  Everett Street Garage Demolition, view from Massachusetts Ave.  

 

Changes on the Law School Campus 2007

  North Entrance to Pound Hall  Wire Relocation on Everett St.  Utility Work on Everett St.  Preparation for Slurry Wall, November 2007  Utility Work between Harkness Commons and Pound Hall (October 2007)  

 

Slurry Wall Construction
2007 - 2008

  Excavating Soil On Site (January 2008)  Hydromill Drilling through Glacial Till and Soft weathered rock (December 2007)  Slurry Wall Cage Construction (December 2007)  Slurry Wall Cage Lowering (December 2007)  View from Pound Hall  
  View a photo
   
  Arches and Steel Erection 2009
 Northwest Arch Installation
 Steel Erection
 Southwest Arch Installation
 Arch Installation View from Pound Hall
 Aerial View of Steel Progress
   
  The House Moves 2007
 Carriage House Preparation, view 1
 Carriage House Preparation, view 2
 Baker House Preparation, view 1
 Baker House lifted off its foundation
  Ukrainian House Preparation
 Partial Demolition of North Hall
 Ukrainian House Moving, View 1
 Ukrainian House Moving, View 2
 Baker House Moving
 Carriage House Moving
   
  Wyeth Hall Demolition 2007
 Wyeth Hall Demolition, View 1
 Wyeth Hall Demolition, View 2
 Wyeth Hall Demolition, View 3
 Wyeth Hall Demolition, View 4
 Wyeth Hall Demolition, View 5
   
  Everett St. Garage Demolition 2007
 Everett St. Garage Preparation, View 1
 Everett St. Garage Preparation, View 2
 Everett St. Garage Demolition, View 1
 Everett St. Garage Demolition, View 2
 Everett St. Garage Demolition, View 3
   
  Changes on the Law School Campus 2007
 North Entrance to Pound Hall
 Wire Relocation on Everett St.
 Utility Work on Everett St.
 Preparation for Slurry Wall
 Harkness/Pound Utility Work
   
  Slurry Wall Construction 2007 - 2008
 Excavating Soil On Site
 Hydromill Drilling
 Slurry Wall Cage Construction
 Slurry Wall Cage Lowering
 View from Pound Hall